Skip to content

Websites

Website redesign checklist: plan to launch

Keep what works. Fix the rest.

A website redesign checklist keeps your new site from losing what the old one earned: record what works now, decide what the new site has to do, carry every page that ranks or sells across, then launch with redirects and tracking in place. Most redesigns that go wrong skip the first step or the last one, not the design in the middle.

Josef Winstone, Founder & Managing Director, Foundry Agency

By Josef WinstoneFounder & Managing Director · 6 min readUpdated

What should a website redesign checklist cover?

It should cover the whole job, not just the look. A redesign is five stages: audit, plan, content, build and launch, then a short period of watching what happens.

The look is the part everyone enjoys talking about. The audit and the launch are where the risk sits, because that's where rankings, links and tracking get lost if nobody owns them.

What should you record before a redesign?

Record everything that's working, so you know what the new site must keep. Half an hour in Search Console and your analytics is usually enough.

  • A full list of current URLs, from your sitemap or a crawl.
  • The pages that bring in search clicks, and the searches they appear for, from Search Console.
  • The pages other sites link to, from the Search Console links report.
  • The pages that produce enquiries, calls or sales, from your analytics.
  • How fast the main pages load on a phone today, so you can compare after launch.
  • The questions customers ask most, from your inbox and phone calls. They're the best brief for new copy.

What does the website redesign checklist look like, step by step?

Work through these in order. Each one depends on the one before.

  1. Audit the current site: URLs, top pages, linked pages, converting pages and speed.
  2. Write down the goal in one sentence, such as more quote requests from commercial buyers.
  3. Name one decision-maker who can sign off copy and design without waiting for a meeting.
  4. List the pages the new site needs, and mark every old page as keep, merge or retire.
  5. Map each old URL to its new home. Anything retired points to the closest relevant page.
  6. Write the copy for the key pages before design starts, answering the questions customers actually ask.
  7. Gather brand assets, photos and logins (domain, hosting, analytics) in one shared folder.
  8. Design and build on a preview link, and review it on your own phone, not just a desktop.
  9. Set up page titles, meta descriptions, schema and a sitemap for every page.
  10. Set up tracking for forms, calls and sales, and test each one.
  11. Launch with the redirects live, then run the launch checks on the new site.
  12. Watch Search Console, rankings and enquiries for the next few weeks, and fix anything that drops.

How do you redesign a website without losing Google rankings?

Keep the content that ranks, redirect every old URL that changes to its closest new page with a permanent redirect, and check Search Console after launch. Google's own guidance on site moves follows the same pattern.

The common mistake is cutting a page because it looks dull, when it quietly brings in a steady stream of searches. If a page earns traffic, rewrite it and keep it. Our guide to website migration SEO covers URL mapping and redirects in more detail.

What usually goes wrong in a website redesign?

The same few things, and they're all avoidable with a list like the one above.

  • Pages that ranked are deleted or moved with no redirect.
  • The new site launches still blocked from search engines, a setting left on from the preview.
  • Contact forms or tracking break, so enquiries vanish without anyone noticing.
  • Copy is left until the end and holds up the whole launch.
  • Too many people sign off, so feedback arrives days apart and contradicts itself.
  • The design is approved on a big screen and only checked on a phone after launch.

Do you need a full redesign or just a refresh?

If the site is fast, easy to edit and brings in enquiries, a refresh of the copy and design may be all you need. If it's slow, hard to change or built on a platform nobody wants to touch, a rebuild usually costs less in the long run than patching it.

A good test: list the five changes you want most. If the current site can make them in a day, refresh it. If each one turns into a project, rebuild.

How does Foundry run a website redesign?

We start with a short call and an audit of your current site: the pages that rank, the pages that sell and the pages with links. Then you get a written plan, a timeline and a fixed price before any work starts. Websites start from £499 + VAT.

We write the copy, design and build on a live preview link, and you send feedback on WhatsApp or Slack. Every old URL is mapped and redirected, and we set up Search Console and Bing at launch. After launch we watch the data and fix anything that drops. Our average is 5 days from kick-off to live, and bigger sites take longer.

Our averages. Not our best days.

Our averages

  • 5days

    Website, kick-off to livethis service

  • 20mins

    Average reply time

Website redesign FAQs

  • Our average is 5 days from kick-off to live for a business website. Large sites with years of content, shops and integrations take longer. Most of the time on slow redesigns is spent waiting for copy and sign-off.

  • Not if it's planned. Keep the pages that rank, redirect every changed URL to its closest new page and check Search Console after launch. A short wobble while Google recrawls is normal.

  • Where they're clean and make sense, yes. Keeping a URL is the safest option. Where a URL has to change, set up a permanent redirect from the old one.

  • One decision-maker, your logo and photos, logins for your domain and analytics, and a few lines on what you sell, who buys it and why they pick you.

  • It depends on the number of pages, features and integrations. With Foundry, websites start from £499 + VAT and you get a fixed price in writing after a short call.

  • You can, but staged redesigns often leave two styles live for months. For most small business sites, one clean launch with redirects is quicker and less confusing.

Redesign on the cards? Get moving.

Tell us what you need. We'll reply within the hour (working hours), and most websites go live about 5 days after kick-off.

We'll reply within the hour (working hours).

Or email hello@foundryagency.co.uk

Analytics cookies are off until you accept. We use them to see which pages help. Cookie notice